Energy Alliance Looks Forward

February 24, 2011
Williston Herald

Brian Freed with Sugarland, Texas-based Rangeland Energy outlined a bulk storage plant and terminal to be constructed on the east side of Epping.

The facility, expected to be operational by Jan. 1, 2012, will have a truck station, tank farm, rail loading facility and outbound pump station. A 21-mile oil pipeline from the new Epping facility would run east to the Beaver Lodge facility, a terminal near Tioga.

Follow the link below to read the full article.